Fwd: Lost Time

12:44


Lost time is the time an operator loses which is outside of his/her control. This time will affect the efficiency of an operator unless it is taken into consideration.

Categories of lost time are:

·         Waiting for work

·         Machine trouble

·         Doing the other person's repairs

·         Doing samples

·         Power failures

·         Meetings etc.

Since the above points cannot be controlled by the operator, the time spent is subtracted from the attended minutes of the operator when calculating the daily efficiency.

For example:

If no lost time occurred operator efficiency is calculated as,

If, however the operator had 

waited for work for            = 30 min

Done sample for              = 40 min

Machine trouble for       = 30 min

  Total                      = 100 min

The calculation would now be worked as


 

 

LOST TIME REPORT ** FORMAT

Name

 

Clock No.

 

Week Ending

 

A) Machine B/Down

B) No Supply

C)No Cut Work

D) INSTR/ Supervisor

E) Repairs

F) Samples

G) Cutting Room fault

H) Trimming Supply

I) Others

 

 

 

 

ON

OFF

Code/ Total

ON

OFF

Code/ Total

ON

OFF

Code/ Total

ON

OFF

Code/ Total

Monday

 

 

 

 

 

 

 

 

 

 

 

 

Tuesday

 

 

 

 

 

 

 

 

 

 

 

 

Wednesday

 

 

 

 

 

 

 

 

 

 

 

 

Thursday

 

 

 

 

 

 

 

 

 

 

 

 

Friday

 

 

 

 

 

 

 

 

 

 

 

 

Saturday

 

 

 

 

 

 

 

 

 

 

 

 

 

The lost time is calculated to find out the exact efficiency obtained to the operator. 


Share this

Related Posts

Latest
Previous
Next Post »